Lowest Price of the Year
Black Friday Deals, Up To 23% OFF
Save $300.00
Save $150.00
Network RTK access is included at no extra cost, with required cellular data provided free of charge.
Provides 4G connectivity for remote app control, out-of-boundary alerts, and real-time GPS tracking. Includes Connect+ service: 1 year free for X430 and 2 years free for X450, renewing annually at $32.90.
Lowest Price of the Year
Black Friday Deals, Up To 23% OFF
Frequently Bought Together
Exclusive id.me discount for military, teachers, first responders, medical staff, students & more.
Pairs well with
No Scraping, No Slipping,
No Damage
Rear-wheel coordination enables true zero-turn steering without tearing the turf, while the Traction Control System automatically adjusts traction on wet or uneven surfaces to minimize slippage. Mow without damaging your turf and achieve a perfect finish.
Smarter Power Use, Up to 30% Energy Savings³
The adaptive rear wheel activates only when extra power is needed, conserving energy and extending runtime by as much as 30%.

EFLS™ NRTK: Network RTK + Vision Dual Precision
Reliable Coverage, Seamless Accuracy, Anywhere
Unlock centimeter-level precision with upgraded tri-frequency Network RTK combined with Vision fusion positioning. Achieve 30 percent higher accuracy and stable signals even in tight, cluttered, or obstructed areas. Control your lawn with effortless, pinpoint precision.
VisionFence™ : AI-Powered Smart Detection
Intelligent Mowing, 150+ Obstacles Handled
Our AI-powered technology detects pets, tools, and even tiny obstacles , rerouting in just 0.1 second to keep a safe 1 meter distance. Safe, fast, and hassle-free. Your perfect lawn, guaranteed.
The intelligent mower that truly works for you
Your Smarter Everyday Helper
Smart anti-theft alerts you instantly if the mower is moved or lifted. Check its real-time location anytime for complete peace of mind.
Seamlessly integrates with Alexa and Google Home. Just say the word to start or stop mowing.
Detects rain, frost, snow, strong wind or heat automatically and returns to charge, ensuring safe operation in every season.
Easily auto-map disconnected lawn areas and integrate into your existing map with Navimow's Isolated Zone Mapping feature. Plus, freely share your mower and app experience with neighbors without privacy concerns, with full control over shareable data.
Durable, dependable, and effortless to maintain
Built to Last. Designed for Ease
Withstands rain, dust, and dirt. A quick rinse and your mower is ready to get back out there.
Ensures color and materials stay sleek year after year.
Includes 2-year battery coverage and a full 3-year product warranty for worry-free ownership.
What's in the Box?

Download Navimow App now for easy robot activation (supporting Bluetooth, Wi-Fi and 4G), user guidance, and remote control. Manage and control your Navimow at finger tips.
Compared to the Navimow i1 series, the i2 series features the following upgrades:
50% improved climbing capability, from 30% (17°) to 45% (24°); The upgraded powertrain enables the i2 AWD series to overcome obstacles more effectively than the i1 series.
Built-in 4G module, No antenna needed;
All-terrain tires included;
Enhanced mowing efficiency with an upgraded blade disc from 3 to 5 blades;
Advanced mapping technology, with Auto Mapping for a more effortless experience.
The dimensions of the Navimow i2 AWD series are 21.4 x 15.1 x 11.2 inches. Please ensure sufficient clearance when passing through narrow obstacles.
Many customers setup their robotic mowers at the edge of the lawn for easier access to a power source.
All Navimow robotic lawn mowers support voice control via Amazon Alexa and Google Home. For a hands-on mowing experience, you can also use your mower manually through the Navimow App.
i206 AWD: Battery capacity 2.55Ah; charging time 60 minutes per cycle; daily mowing area 0.37 acre / 24 hours
i210 AWD: Battery capacity 5.1Ah; charging time 120 minutes per cycle; daily mowing area 0.37 acre / 24 hours
The Navimow i2 series includes lifetime free NRTK service. You may also opt for parcel insurance and return insurance to protect your order. Additionally, purchasing the i2 series entitles you to 1 year of free 4G data service.
Navimow i206 AWD is designed for lawns up to 0.15 acres for smooth navigation and the best mowing performance.
For added flexibility, the mower may support a maximum mowing area of up to 0.18 acres depending on your yard's layout, shape, and complexity.
You can divide your yard into multiple zones, but all zones share one total map limit. The total mapped lawn area across all zones should stay within the supported maximum.
1.Maximum Slope Ability: Measured under test conditions with 1.97 inch grass height, dry grass surface, and a slope free of obstacles.
2.Vertical Passing Ability: Measured on a flat surface with forward traversal of a 1.57 inch vertical step; cutting blade height set at 3.6 inch.
3.30% Energy Boost (On-Demand 3WD): Tested on flat, obstacle-free lawn at 77 °F; energy consumption measured for on-demand 3WD versus full- time 3WD use over the same period.
4.Network RTK feature: Network RTK access is included at no extra cost, and the required cellular data are provided free of charge.
5. Mapping Area: Supports map storage up to 1.2× the recommended mowing area (e.g. up to 1.2 acres for a 1-acre model). Actual mappable area may vary depending on yard layout and complexity.
Customers who pay a deposit between 1/16–2/12 (PST) can enjoy 10% off the full mower price, a garage for the i2 AWD series, double points rewards, and 3 sets of blades with hassle-less replacement coverage for the entire year when completing their balance payment between 2/13–3/14 (PST). Orders will be shipped on a first-come, first-served basis, and gifts will be shipped together with the mower.
Navimow CES Early Bird Special Campaign Terms and Conditions
Campaign Period:
Pre-Order: Jan 16, 2026, 12:00 a.m. PT – Feb 12, 2026, 12:59 p.m. PT
Final Sale: Feb 13, 2026, 12:00 a.m. PT – Mar 14, 2026, 12:59 p.m. PT
Eligibility:
U.S. residents (contiguous United States), age 18+.
Excludes Navimow employees and their immediate family members.
Each participant is limited to one participation per SKU per email address.
How It Works:
Pay a deposit during the Pre-Order Period.
Complete full payment during the Final Sale Period.
Deposit is non-refundable if the balance is not completed.
Deposit is refundable only if the full order is refunded per Navimow Return Policy.
Early Bird Benefits:
Applicable Mower:
Navimow i2 AWD Series (i206 AWD / i210 AWD)
Deposit:
$100
Early Bird Offers:
10% OFF on i2 AWD Series Mower
1× Garage S (GIFT)
3× Blade Assembly Plus sets (GIFT)
2× Points rewards
Other Notes:
Early Bird gifts are added automatically at checkout.
Designated coupons may be applied during final payment.
Quantities and availability are subject to change.
For full details, including eligibility, deposit rules, return & warranty policies, tax obligations, and dispute resolution, please visit the official campaign terms page on Navimow’s website.